Transformation of sorting centers for Ukrposhta
Client
Ukrposhta
Location
Ukraine
Implementation period
6 months (We are still working on the project to this day)
Tasks
01
Increasing the speed and accuracy of sorting parcels by direction
02
Optimization of operating costs and reduction of required personnel
Solution
Key Result
x20
Increasing the processing speed of small parcels from 400 pcs/hour to 8000/hour
x8
One lane can sort 150 thousand+ parcels per day. This is 8 times more than workers manually processed before the solution was introduced.
95%
Reduce required personnel by up to 95%
98%
High sorting accuracy – 98%